Transformation & Tech · IT Risk & Technology Assurance
Business Continuity & Disaster Recovery Reviews
A Business Continuity & Disaster Recovery Review answers one operational question with evidence, not assumption: if your core systems, your primary facility, or a critical vendor went down tomorrow, would your organisation actually keep running — and for how long could it survive before the damage became irreversible?
Chartered Accountants · Chennai · Hyderabad · Bangalore · Dubai · Since 1986
A Business Continuity & Disaster Recovery Review answers one operational question with evidence, not assumption: if your core systems, your primary facility, or a critical vendor went down tomorrow, would your organisation actually keep running — and for how long could it survive before the damage became irreversible? At PNPC Global, we do not hand you a generic BCP template with your logo on the cover. We map your actual critical processes, test your actual backup and failover arrangements, and run your team through a realistic disruption scenario to see whether the plan on paper would genuinely work when invoked. This is an IT-risk and operational-resilience engagement — evaluating the technical and organisational architecture that keeps your business alive through disruption — reviewed and reported by a CA firm that also understands the governance, statutory, and Board-reporting context around it.
What it costs
No hidden charges. The exact figure is set in your engagement letter.
A Business Continuity & Disaster Recovery Review evaluates whether an organisation can keep its critical operations running through a disruption — a cyberattack, a data centre outage, a facility loss, a key-vendor failure, a regional event — and whether the technical Disaster Recovery (DR) arrangements that exist on paper would actually restore systems and data within the time and data-loss tolerances the business needs. The review has two connected halves. The business continuity half identifies which processes are genuinely mission-critical, quantifies the Recovery Time Objective (RTO — how quickly each process must be restored) and Recovery Point Objective (RPO — how much data loss is tolerable) for each, and maps single points of failure across people, vendors, facilities, and systems. The disaster recovery half goes deeper into the technical architecture underneath that plan: backup frequency and retention, replication arrangements between primary and DR sites, failover mechanics, cloud or co-location DR readiness, and — critically — whether backups have actually been tested to confirm they restore cleanly, rather than merely existing.
Most organisations we review have a written BCP-DR document, often produced years ago or adapted from a template, that has never been tested against a live scenario. A document review alone cannot catch what a tabletop exercise or a simulated failover reveals: an outdated contact list, a backup that has not been test-restored in years, a DR site whose licences and access rights were never actually provisioned, or an assumption that a specific person will lead the response when that person has since left the organisation. PNPC's approach combines document review, technical verification of backup and replication arrangements, and a facilitated simulation — because the value of a BCP-DR plan is not that it exists, but that it works under pressure.
The governance backdrop in India increasingly expects this level of rigour, particularly for regulated and listed entities. SEBI's Cybersecurity and Cyber Resilience Framework (CSCRF), applicable to Qualified Regulated Entities including stock exchanges, depositories, and registered intermediaries, mandates a documented and periodically tested business continuity and disaster recovery plan with defined RTO/RPO targets. RBI's IT Governance, Risk, Controls and Assurance Practices framework requires regulated entities — banks, NBFCs, payment system operators — to maintain a Board-approved BCP-DR framework, conduct periodic DR drills, and report testing outcomes to the Board or an IT Strategy/Risk Committee. SEBI LODR Regulation 21 requires the Risk Management Committee of the top 1,000 listed companies by market capitalisation to address business continuity and cybersecurity risk explicitly within its risk management policy. Section 134(5)(e) of the Companies Act 2013 requires directors of applicable companies to represent that internal financial controls are adequate and operating effectively — a representation that is difficult to make credibly if core financial systems have no tested recovery plan. None of these frameworks prescribe a single fixed methodology, which is exactly why an evidence-based, business-specific review matters more than a generic compliance checklist.
For unregulated and mid-sized businesses, the driver is usually more immediate: a recent ransomware scare, a cloud outage that exposed how little redundancy existed, a customer or investor due-diligence questionnaire asking pointed questions about DR readiness, or simply the realisation that nobody in the organisation actually knows how long a core system outage could be tolerated before it became an existential problem. A well-run review does not end with a report that gets filed away — it ends with a tested (not merely written) BCP-DR plan, a prioritised remediation roadmap with named owners and realistic timelines, and a Board or management team that has actually rehearsed what to do when the plan is needed for real.
When this review is the right call
SEBI-regulated intermediary, stock exchange, depository, or Qualified Regulated Entity that must demonstrate a documented and periodically tested BCP-DR framework under the SEBI Cybersecurity and Cyber Resilience Framework (CSCRF)
Bank, NBFC, or payment system operator whose Board or IT Strategy Committee needs evidence of a tested BCP-DR arrangement consistent with RBI's IT governance and risk expectations
Listed company whose Risk Management Committee under SEBI LODR Regulation 21 must show that business continuity and cybersecurity risk are addressed within its formal risk management policy, not just referenced in passing
Organisation that has a written BCP-DR document that has never actually been tested through a tabletop exercise, a simulated failover, or a real backup restoration
Company that has experienced a near-miss — a ransomware attempt, a cloud or data-centre outage, an ERP failure, a facility becoming inaccessible — and wants a structured review rather than an ad hoc fix to the specific incident
Business migrating core systems to the cloud, changing ERP platforms, or consolidating data centres, where DR architecture needs to be redesigned and validated for the new environment
Organisation preparing for a fundraise, acquisition, or enterprise client onboarding where institutional counterparties will specifically probe operational resilience and DR maturity as part of due diligence
Group structure with a UAE or overseas subsidiary where continuity planning and DR standards across entities have never been assessed on a consistent basis
Statutory auditor or Audit Committee flags reliance on IT systems for financial reporting and wants independent assurance that the underlying systems have a credible recovery plan
When a narrower or different engagement fits better
You need a combined operational-continuity and internal-fraud-risk review — that broader, dual-domain engagement is our Business Continuity & Fraud Risk Assessment, which pairs BCP with fraud triangle mapping and segregation-of-duties testing
You need penetration testing, vulnerability scanning, or a full technical cybersecurity control review — that sits within our Cybersecurity Audit, which goes deeper on the technical security layer than a continuity-and-recovery review
You need the Board's Section 143(3)(i)/134(5)(e) Internal Financial Controls certification itself prepared and tested against the codified ICFR standard — that is an IFC Review engagement, narrower and specifically scoped to financial reporting controls
You need a broader IT General Controls (ITGC) review covering access management, change management, and system operations as a whole, of which DR readiness is one component — our IT Governance engagement covers that wider scope
You need to investigate an incident that has already occurred — a real outage, a real data loss event, a real breach — that is an incident response and root-cause investigation, not a proactive continuity review, though we typically recommend a BCP-DR review as the follow-on once the incident is resolved
Your organisation is a very early-stage startup with a handful of employees, a single cloud-hosted application, and no material customer SLA — the formality of a full review is disproportionate at this stage; a lighter foundational backup-and-recovery conversation is more appropriate
You need ongoing, cyclical testing of IT process controls as a continuous programme rather than a point-in-time review — a structured Internal Audit function under Section 138, with BCP-DR testing as one recurring workstream, is the better long-term vehicle
BCP & DR Review vs adjacent risk and IT assurance engagements
| Feature | BCP & DR Review | BCP & Fraud Risk Assessment | Cybersecurity Audit | IT Governance / ITGC Review | Forensic Audit |
|---|---|---|---|---|---|
| Primary objective | Assess operational resilience and validate that DR architecture actually restores systems within RTO/RPO | Assess operational resilience and fraud opportunity together across people, process, and control | Assess technical IT security controls and vulnerability exposure | Assess IT General Controls — access, change management, operations — of which DR is one component | Investigate a specific, already-suspected irregularity or incident |
| Governing framework/standard | ISO 22301 (BCM reference), SEBI CSCRF, RBI IT governance framework, NIST SP 800-34 (technical DR) | COSO ERM 2017, Fraud Triangle model, ISO 22301, SA 240 | ISO 27001, NIST CSF, sector-specific technical standards | COBIT, ISO 27001 Annex A, SA 315 (ITGC relevance to audit) | No single statute — scoped to the specific matter and forensic evidentiary standards |
| Core testing method | Tabletop simulation, backup restoration test, failover/DR drill verification | Tabletop simulation, fraud scenario testing, segregation-of-duties and access-rights testing | Penetration testing, vulnerability scanning, configuration review | Sample-based testing of access provisioning, change tickets, and operational logs | Evidence gathering, forensic data analysis, interviews specific to the matter |
| Scope breadth | Critical process mapping, single points of failure, and technical DR architecture validation | Critical process mapping, single points of failure, and fraud opportunity across the control environment | IT infrastructure, applications, and technical security controls | Access management, change management, and operations controls across IT systems | Narrow and incident-specific — the individuals, transactions, or period under question |
| Typical output | Business Impact Analysis, tested/updated BCP-DR plan, DR readiness rating, remediation roadmap | Business Impact Analysis, tested/updated BCP-DR plan, fraud risk heat map, remediation roadmap | Vulnerability report, penetration test findings, remediation plan | ITGC gap register, control maturity rating, remediation roadmap | Investigation report — findings, quantification, and recommendations |
| Frequency | Typically every 1–2 years, or after material system/infrastructure change | Typically every 1–2 years, or after material business change | Annual or per compliance requirement | Annual or per statutory audit reliance requirement | One-off, triggered by an event |
| Reports to | Board / Audit Committee / IT Strategy Committee / Risk Management Committee | Board / Audit Committee / Risk Management Committee | IT/Security leadership, and Board where material | Audit Committee / statutory auditor (for reliance purposes) | Whoever commissions it — Board, Audit Committee, or specific stakeholder |
| Best suited to | Organisations needing focused, evidence-based assurance that systems and data actually recover on time | Boards wanting a combined view of resilience and fraud exposure before an incident forces the question | Companies with material IT/data dependency needing technical security assurance | Companies where auditors or regulators need assurance over the broader IT control environment | Companies facing a specific fraud, whistleblower complaint, or dispute |
These engagements are complementary, not substitutes, and PNPC scopes each independently based on your actual driver. Many clients start with a focused BCP & DR Review and add fraud risk, cybersecurity, or ITGC coverage in a later phase once the initial findings indicate where the deeper risk actually sits.
| # | Stage & What PNPC Does | What Generic Providers Skip | Timeline |
|---|---|---|---|
| 1 | Scoping & Objective-Setting | We start by understanding what triggered the need — a SEBI CSCRF or RBI obligation, a near-miss outage, pre-fundraise or pre-onboarding readiness, or first-time formalisation — because this determines whether the review should be entity-wide or focused on the highest-risk systems. Generic providers frequently apply a fixed-scope template regardless of the actual driver. | Week 1 |
| 2 | Critical Process & System Identification | We work with process and system owners to identify which applications, data flows, and facilities are genuinely mission-critical (ERP, payroll, customer-facing systems, treasury, statutory filing capability) versus important-but-deferrable — a step most template BCP exercises skip, defaulting to identical priority for every system. | Week 1–2 |
| 3 | Business Impact Analysis (BIA) — RTO/RPO Quantification | For each critical process and system, we quantify Maximum Tolerable Downtime, Recovery Time Objective, and Recovery Point Objective in consultation with business owners — not IT alone — because the business, not the IT team, should define how much downtime and data loss it can actually absorb. | Week 2–3 |
| 4 | Single Point of Failure & DR Architecture Mapping | We map dependency on key individuals, sole-source vendors, single facilities, single cloud regions, and single IT systems, and document the existing DR architecture — primary/DR site pairing, replication method, cloud region redundancy, backup topology — as it actually exists, not as the architecture diagram claims. | Week 3–4 |
| 5 | Existing BCP/DRP Document Review | Where a BCP or DRP already exists, we review it against the BIA findings to check whether it actually addresses the systems and processes identified as critical, or whether it is a generic document — often adapted from a template or a prior employer's plan — that does not reflect this organisation's actual environment. | Week 3–4 |
| 6 | Backup & Replication Verification | We verify backup frequency, retention period, and — most importantly — whether a test restoration has actually been performed and confirmed successful within a reasonable recent period. A backup that has never been restored is, for practical purposes, unverified and cannot be relied upon. | Week 4–5 |
| 7 | Failover / DR Drill Assessment | Where a DR site or environment exists, we assess whether a failover has ever actually been executed — even in a controlled test window — and what the observed recovery time was against the stated RTO. Where no failover has been tested, we scope a controlled test as part of the engagement wherever feasible. | Week 5–6 |
| 8 | Tabletop Exercise / BCP-DR Simulation | We run a facilitated tabletop exercise — a simulated disruption scenario relevant to the business (core system outage, ransomware event, facility inaccessibility, key-vendor failure) — walking management and IT through the actual decisions and communications the written plan calls for, which reliably surfaces gaps a paper review alone would miss. | Week 6–7 |
| 9 | Findings Consolidation & Risk Rating | Findings are rated (Critical/High/Medium/Low) based on likelihood and potential impact, with each finding mapped back to the specific process or system it affects and the gap between stated RTO/RPO and what was actually observed during testing. | Week 7 |
| 10 | Draft Report & Management Response | A draft report is shared with management to confirm factual accuracy and capture a proposed remediation owner and timeline for each finding, before anything reaches the Audit Committee or Board — avoiding a report the Board sees for the first time with no indication of how findings will be addressed. | Week 7–8 |
| 11 | Presentation to Audit Committee / Board / IT Strategy Committee | PNPC's engagement partner presents the findings, the updated BCP-DR recommendations, and the DR readiness rating directly to the Committee or Board, answering questions in real time rather than leaving a written report to be summarised by the Company Secretary or IT Head. | Week 8 |
| 12 | Remediation Support & BCP/DRP Finalisation | PNPC supports process and IT owners in updating the BCP-DR document to reflect BIA findings, closing backup or replication gaps identified, and sequencing remediation by priority so the highest-risk gaps are addressed first. | Week 8–12 |
| 13 | Follow-Up Verification & Next-Cycle Planning | A follow-up review confirms that remediation actions — including re-tested backups and a re-run failover where applicable — were genuinely implemented, and PNPC works with the Audit Committee to plan the next review cycle, incorporating any infrastructure changes since the last review. | 3–6 months post-report, then per agreed cycle |
Realistic end-to-end timeline: 8–12 weeks from initial scoping to Board presentation for a first-time, entity-wide review of a mid-sized organisation, depending on the number of critical systems, locations, and whether a live failover test is included in scope. Subsequent cycles are generally faster once the BIA and DR baseline already exist.
Organisation chart identifying process owners, IT ownership, and reporting lines across critical functions
Process maps or Standard Operating Procedures (SOPs) for key business processes dependent on IT systems — order-to-cash, payroll, treasury, statutory filing
List of premises, facilities, and locations relevant to operations, including ownership/lease status and any co-location or data centre arrangements
IT systems inventory — core applications, hosting arrangement (on-premise/cloud/hybrid), and existing criticality ranking if one already exists
Any existing Business Continuity Plan (BCP) or Disaster Recovery Plan (DRP) document, however dated
Prior business continuity or disaster recovery test/exercise records, if any tabletop, failover drill, or simulation has previously been conducted
IT backup policy and evidence of backup testing — frequency, retention, and date and outcome of the last successful restoration test
Insurance policy schedule — business interruption, cyber, property, and Directors & Officers (D&O) cover as applicable
Vendor and cloud/hosting provider contracts, including any Service Level Agreements (SLAs), uptime guarantees, and DR/continuity clauses
Network and infrastructure architecture diagram showing primary and DR site/region, if one exists
Data replication method and frequency between primary and DR environments (synchronous, asynchronous, or backup-based)
List of applications with defined RTO/RPO, if any have been formally assigned prior to this review
Cloud provider region/availability-zone configuration and redundancy settings for cloud-hosted systems
Incident response and escalation runbook, where one exists, covering who declares an incident and how it is communicated
Most recent SEBI CSCRF or RBI IT governance self-assessment or compliance filing, if applicable to your entity category
Risk Management Committee charter and minutes referencing business continuity or cybersecurity risk, if a Committee exists
Any prior IT audit, ITGC review, cybersecurity audit, or GRC assessment reports and their remediation status
Regulatory correspondence, show-cause notices, or inspection findings relevant to IT resilience received in the review period, if any
List of roles/individuals holding sole institutional knowledge of critical IT systems, infrastructure, or vendor relationships
Succession or cross-training documentation, if any exists, for key IT and infrastructure roles
Current BCP-DR contact/escalation list — verified for accuracy against current employee roster
Key-vendor and managed-service-provider contact and escalation details for infrastructure and application support
Group/subsidiary structure chart, including any UAE or overseas entity, with an indication of shared or separate IT infrastructure and DR arrangements
Any existing DR arrangement or shared infrastructure between Indian and overseas entities, including data residency or cross-border data transfer considerations
| Phase | Triggered By | PNPC CA Guidance | Risk If Ignored |
|---|---|---|---|
| Pre-Engagement Scoping | Board, Audit Committee, or IT leadership decision to commission the review | Scoping conversation to align on driver — SEBI CSCRF/RBI obligation, near-miss incident, pre-transaction readiness, or first-time formalisation — and right-size the review to entity scale and IT complexity. | A generic, wrong-sized scope either misses risks specific to this business's actual systems or imposes disproportionate cost and management time on a smaller organisation. |
| Business Impact Analysis | Engagement kickoff | Identification of genuinely critical processes and systems and quantification of RTO/RPO for each, rather than treating every system as equally critical, which dilutes the plan and the recovery resources behind it. | Without a proper BIA, DR investment either protects the wrong systems first or spreads limited recovery resources evenly across systems of very different real-world criticality. |
| DR Architecture & Backup Verification | BIA substantially complete | Technical verification of backup frequency, retention, replication method, and — critically — actual test-restoration history, rather than accepting a policy document at face value. | A backup regime that has never been test-restored routinely fails at the exact moment it is needed — corrupted backup files, incompatible restore procedures, or missing encryption keys surface only during a real incident. |
| Tabletop Exercise & Failover Test | Mapping and verification complete | A facilitated simulation of a realistic disruption scenario, walking management and IT through the plan's actual mechanics — who declares the incident, what system comes up first, what the manual workaround is — combined with a controlled failover test where feasible. | A BCP-DR plan that has never been rehearsed frequently fails at the exact moment it is needed — the plan reads well on paper but the contact list is outdated, the DR environment was never actually provisioned, or no one has the access rights to execute the failover. |
| Reporting & Board Presentation | Testing and findings consolidated | Draft report validated by management, then presented directly to the Audit Committee/Board/IT Strategy Committee by the engagement partner, with remediation ownership and realistic timelines agreed in the room. | Findings emailed without a live Board discussion are frequently filed without genuine engagement, and the Board's own governance representations end up resting on a plan that was never actually discussed or tested at Board level. |
| Remediation & BCP/DRP Update | Report accepted, roadmap agreed | PNPC supports updating the BCP/DRP to reflect BIA findings, closing backup, replication, or access gaps identified, and sequencing remediation by priority so highest-risk gaps are closed first. | Remediation left with IT teams and no structured follow-up routinely stalls against day-to-day operational pressure, particularly for fixes that require budget or vendor contract changes. |
| Follow-Up Verification | Agreed remediation period elapses | Independent follow-up testing — including a re-run backup restoration or failover test — to confirm remediation genuinely closed the gap, not simply marked complete by the same team responsible for the original finding. | Self-certified closure without independent re-testing is the most common reason the same DR gap resurfaces in the next review cycle or, worse, during an actual incident. |
| Trigger Events (Incident, Migration, Fundraise) | Actual disruption, system migration, or investor/client due diligence | Where an actual incident occurs, PNPC supports post-incident review alongside a root-cause assessment; where a system migration or cloud move changes the risk profile, the BIA and DR architecture are re-verified against the new environment. | An untested BCP-DR plan discovered for the first time during a live incident or live investor/client due diligence is materially more costly and disruptive than the same gap addressed on a planned review cycle. |
What exactly is a Business Continuity & Disaster Recovery Review, in plain terms?
It is a structured review that answers a practical question: if your core systems, your office, or a critical vendor became unavailable tomorrow, how long could your business keep operating, and would your backup and recovery arrangements actually restore things in time? We map which processes and systems are genuinely critical, check whether your backup and disaster recovery setup would actually work if you needed it, and run a simulated disruption exercise to see how your team responds in practice — not just what the written plan says on paper.
Is a Business Continuity & Disaster Recovery Review legally required for my company?
It depends on your entity type. SEBI-regulated intermediaries, stock exchanges, depositories, and other Qualified Regulated Entities are required to maintain a documented and periodically tested BCP-DR framework with defined RTO/RPO targets under SEBI's Cybersecurity and Cyber Resilience Framework (CSCRF). Banks, NBFCs, and payment system operators face similar expectations under RBI's IT governance and risk framework, including periodic DR drills reported to the Board or IT Strategy Committee. Listed companies more broadly must address business continuity within the Risk Management Committee's policy under SEBI LODR Regulation 21 for the top 1,000 companies by market capitalisation. For unregulated private companies, there is no single statute naming this review, but Section 134(5)(e)'s internal financial controls representation is difficult to make credibly without knowing your financial systems can actually recover.
How is this different from PNPC's Business Continuity & Fraud Risk Assessment?
Both share the Business Impact Analysis and single-point-of-failure mapping methodology, because operational resilience is a common foundation. This BCP & DR Review goes deeper into the technical disaster recovery architecture — backup verification, replication testing, failover drills, DR site readiness — and is the right scope when fraud risk is not the immediate concern. The Business Continuity & Fraud Risk Assessment adds fraud triangle mapping and segregation-of-duties/access-rights testing on top of the continuity work, and is the right scope when the Board wants both operational resilience and fraud exposure assessed together. Many clients start with one and add the other in a later phase.
What is a Business Impact Analysis (BIA) and why does it come before the DR plan itself?
A Business Impact Analysis identifies which of your business processes and systems are genuinely critical, and for each, quantifies the Maximum Tolerable Downtime, the Recovery Time Objective (how quickly it must be restored), and the Recovery Point Objective (how much data loss, if any, is acceptable). Without a BIA, a DR plan has no basis for prioritisation — it either treats every system as equally urgent, which wastes recovery budget and effort, or is built around IT's assumptions rather than the business's actual tolerance. We always run the BIA first, involving business owners, not just IT; the DR architecture is designed and tested against its findings.
What is the difference between RTO and RPO?
Recovery Time Objective (RTO) is the maximum acceptable time between a disruption occurring and the affected system or process being restored to operation. Recovery Point Objective (RPO) is the maximum acceptable amount of data loss, measured in time — for example, an RPO of 4 hours means you can tolerate losing up to 4 hours of data (the gap since the last successful backup or replication point), but no more. Both are set per system or process based on business tolerance, not on what the current infrastructure happens to be capable of — which is exactly why many organisations discover during this review that their actual DR capability does not match the RTO/RPO the business genuinely needs.
What is a single point of failure, and how do you identify them?
A single point of failure is any person, vendor, system, or facility whose unavailability would materially disrupt a critical process, with no fallback in place. We identify these through structured interviews with process and IT owners, review of vendor and cloud contracts for sole-source dependencies, and technical review of infrastructure architecture for single-region or single-facility exposure. Key-person dependency — where only one individual genuinely understands how to execute a system failover or restore a specific backup — is one of the most common and most under-assessed single points of failure in mid-sized Indian businesses.
We have a written BCP-DR plan already. Why do we need this review?
A written plan tells you what should happen; it does not tell you whether it actually would. Common gaps we find in existing plans: RTO/RPO figures that were guessed rather than derived from a real BIA, a DR environment that was provisioned once and never kept in sync with production changes, backup jobs that run but have never been test-restored, and contact lists referencing people who have since left the organisation. This review tests the plan against reality — through document review, technical verification, and a live tabletop exercise — rather than assuming a written document equals genuine readiness.
What does a backup restoration test actually involve?
It means actually restoring data from a backup — in a controlled, non-production environment — and verifying that the restored data is complete, uncorrupted, and usable, rather than simply confirming that a backup job completed successfully. A backup job showing 'success' in a log only confirms the process ran; it does not confirm the resulting file can actually be restored into a working system. We verify whether your organisation has ever performed this test, and where it has not, we recommend and, where feasible, help coordinate a controlled test as part of the engagement.
What does a tabletop exercise involve, and why is it necessary if we already have a written plan?
A tabletop exercise is a facilitated, structured walkthrough of a realistic disruption scenario — for example, your core ERP becomes unavailable for 48 hours, or a ransomware event locks your primary file server — in which management and IT work through the actual decisions the written plan calls for: who is notified first, who has authority to declare an incident, what the manual workaround is, how customers and vendors are communicated with. This consistently surfaces gaps that a document review alone does not — an outdated contact list, an assumption that someone else holds a critical password, a step that reads clearly on paper but nobody has actually rehearsed.
Can you actually test a full failover to our DR site or DR cloud region?
Where feasible and where the client wants it in scope, yes — we coordinate a controlled failover test during a planned maintenance window, observe the actual recovery time achieved, and compare it against the stated RTO. Where a full production failover is judged too risky or disruptive to test directly, we design a scaled-down or non-production test that still validates the core mechanics — DNS/routing failover, application startup on the DR environment, data currency at the point of failover — without touching live production traffic.
Our systems are entirely cloud-hosted. Do we still need a DR review?
Yes. Cloud hosting materially changes the DR conversation but does not eliminate it. Cloud providers guarantee infrastructure availability under their own SLAs, but the customer remains responsible for application-level recoverability, cross-region or cross-availability-zone redundancy configuration, backup retention within the cloud environment, and access continuity if an account or subscription itself is compromised or locked. We frequently find cloud-hosted businesses assuming the provider 'handles DR' when, in practice, no cross-region redundancy or independent backup has actually been configured — leaving a single-region outage as a genuine, untested risk.
How is this different from a Cybersecurity Audit?
A Cybersecurity Audit assesses the technical security posture of your IT environment — vulnerabilities, penetration-test findings, configuration weaknesses, access control design — focused on preventing and detecting a breach. A BCP & DR Review assumes a disruption has already occurred, regardless of cause, and assesses whether the organisation can keep operating and recover systems and data within acceptable time and data-loss tolerances. The two are complementary: a cybersecurity finding (for example, a ransomware vulnerability) is often the specific trigger scenario tested in the BCP-DR tabletop exercise, and we frequently recommend both together for organisations with material IT dependency.
What is the difference between a BCP and a DRP?
A Business Continuity Plan (BCP) is the broader plan covering how the entire organisation continues critical operations through a disruption — people, processes, facilities, communications, and vendor relationships. A Disaster Recovery Plan (DRP) is the more technical, IT-specific subset focused on restoring systems, applications, and data after an outage. A DRP is typically a component nested within, or run alongside, the broader BCP — restoring the IT system is necessary but not sufficient if, for example, staff cannot reach the facility or a key vendor relationship has also failed.
What red flags does PNPC typically find in a first-time DR review?
The most common findings, in rough order of frequency: backups that have never been test-restored; RTO/RPO figures that were never formally defined or agreed with business owners; a DR environment that exists on paper or in a contract but was never actually provisioned or kept current with production changes; a BCP-DR contact list referencing people no longer at the organisation; single-region cloud deployments with no cross-region redundancy despite an assumption that the cloud provider 'handles' resilience; and no one holding the actual access credentials needed to execute a failover during a real incident.
Does this cover a fraud or internal-control angle as well?
This review is scoped specifically to operational resilience and technical disaster recovery — it does not include fraud triangle mapping or segregation-of-duties testing. Where access-rights weaknesses are identified during the DR review that also have fraud implications (for example, an overly broad admin access group), we flag them, but a dedicated fraud risk assessment is a separate, deeper engagement. Clients wanting both together should scope our combined Business Continuity & Fraud Risk Assessment instead.
What deliverables do we actually receive?
A written report covering: the Business Impact Analysis with RTO/RPO for each critical process and system; a single-point-of-failure register; a DR architecture assessment including backup and replication verification findings; results of any failover test or backup restoration test performed; a rated, prioritised findings register (Critical/High/Medium/Low) with management's response and remediation timeline; an updated or newly drafted BCP-DR plan reflecting the BIA findings; and a recommended follow-up review date. This is supplemented by a live presentation to the Audit Committee or Board and a facilitated tabletop exercise.
How long does the engagement take?
A first-time, entity-wide review for a mid-sized company typically takes 8–12 weeks from initial scoping to Board presentation, depending on the number of critical systems and locations covered, and whether a controlled failover test is included in scope. A more narrowly scoped review — for example, DR verification for a single critical system, or continuity planning for a single facility — can be completed faster. Subsequent cycles are generally quicker once the BIA and DR baseline already exist.
What does this engagement cost?
Fees depend on entity size, the number of critical systems and locations in scope, whether a full failover test is included, and the depth of backup-verification testing agreed. PNPC provides a written scope and fixed-fee proposal after an initial scoping conversation — we do not quote a fee before understanding what is actually being reviewed and why.
Who at PNPC conducts this review — is it the same team as our statutory auditor?
Where PNPC is also your statutory auditor, we structure this engagement with an appropriately separate team and reporting line to preserve independence, consistent with the Companies Act and applicable professional standards. For companies where independence rules restrict the statutory auditor from providing certain non-audit services, we advise upfront on whether PNPC can undertake this review or whether an independent firm should be engaged instead.
Will this disrupt our day-to-day operations while it's underway?
We design the engagement to minimise disruption. Most of the work involves document and architecture review, structured interviews with process and IT owners (typically 30–60 minutes each), and a facilitated tabletop exercise scheduled at a convenient time. Any backup restoration or failover test is planned and executed in a controlled, non-production window agreed with your IT team in advance — never sprung on a live production environment without notice.
Does the report get shared with any regulator?
No. This is a private, management-and-Board-facing advisory engagement — findings are reported to the Audit Committee, IT Strategy Committee, Risk Management Committee, or Board that commissioned it, not to SEBI, RBI, MCA, or any other regulator. Where an applicable regulatory framework (such as SEBI CSCRF or RBI's IT governance requirements) requires the entity itself to periodically self-certify or report DR testing outcomes, that reporting obligation rests with the entity under its own regulatory relationship — PNPC supports preparing the underlying evidence but does not file on the entity's behalf as a matter of course.
How often should this review be repeated?
For SEBI/RBI-regulated entities and larger listed companies with an active Risk Management or IT Strategy Committee, we recommend revisiting the BIA and DR architecture every 1–2 years, or sooner following material change — a new core system, a cloud migration, a new data centre or region, significant infrastructure change, or a merger. For smaller unregulated companies, every 2–3 years, or ahead of a major milestone such as a fundraise or a significant enterprise client onboarding, is generally proportionate.
How does this help us prepare for a fundraise, acquisition, or major client onboarding?
Institutional investors, acquirers, and large enterprise clients routinely assess operational resilience and DR maturity as part of due diligence or vendor onboarding — key-system dependency, untested backups, and single-region infrastructure are common findings that can affect valuation, deal terms, contract terms, or timeline if discovered late in a live process. Conducting this review proactively, well ahead of a transaction or onboarding, allows genuine remediation on your own schedule rather than under the pressure and scrutiny of active diligence.
Does this review apply to a UAE subsidiary or overseas entity as well?
Yes, where in scope. For group structures with a UAE or overseas subsidiary, PNPC's presence in both India and the UAE (Dubai office) allows a coordinated review across jurisdictions under a single engagement — assessing whether continuity planning and DR standards are applied consistently at the subsidiary level, and whether the parent Board has adequate visibility into subsidiary-level infrastructure risk, rather than requiring separate, disconnected reviews by unrelated local providers.
Can this be scoped narrowly — just DR verification for one critical system — rather than an entity-wide review?
Yes. While we recommend an entity-wide first review where budget and time allow, we regularly scope a narrower review — for example, DR verification limited to the core ERP or finance system, or continuity planning limited to a single facility or business unit. A narrower first engagement is often the right starting point for an organisation new to structured DR testing, with broader coverage added in a subsequent phase.
What happens after the report — does PNPC help implement the recommendations, or just identify them?
Both, by design. The report includes specific, sequenced remediation recommendations — not just a description of each gap. Where the client wants implementation support (updating the BCP-DR document, coordinating a genuine failover test, redesigning backup retention policy, provisioning a DR environment), PNPC provides that as a follow-on engagement, kept appropriately separate from the review role where independence considerations require it.
Why should we choose PNPC for this over a specialist IT/DR consultancy or a Big 4 firm?
A Big 4 firm brings brand recognition and large-team capacity, typically at a substantially higher fee, often with the day-to-day engagement led by junior staff. A specialist IT/DR consultancy may bring strong technical infrastructure expertise without the Chartered Accountancy grounding to connect findings back to the actual Companies Act, SEBI, and RBI governance obligations your Board needs represented accurately. PNPC combines nearly four decades of practising CA experience — including statutory audit, tax, and regulatory context that DR findings inevitably touch — with a senior-partner-led engagement model and coordinated India-UAE coverage for group structures.
What does the full PNPC engagement include, end to end?
Scoping consultation aligned to your actual driver and infrastructure profile; Business Impact Analysis with RTO/RPO quantification for critical processes and systems; single-point-of-failure mapping across people, vendors, systems, and facilities; review and update of existing BCP-DR documentation; technical verification of backup frequency, retention, and restoration testing; assessment of replication and failover architecture, including a controlled failover test where feasible; a facilitated tabletop exercise; a rated, prioritised findings register; management response capture; a written report; a live presentation to the Audit Committee/Board/IT Strategy Committee; and a follow-up verification review within the agreed remediation period.
Can this review be triggered as an urgent, accelerated review rather than the standard 8–12 week cycle?
Yes. Where the trigger is time-sensitive — an active investor or enterprise client due-diligence process with a tight timeline, or a recent near-miss outage the Board wants addressed urgently — we can scope an accelerated, focused review covering the highest-risk systems and the most material DR gaps first, with the full review following as a second phase. This trades some breadth for speed and is agreed explicitly at scoping, not assumed.
What is the role of the Audit Committee or Risk Management Committee in this process?
For listed companies and regulated entities, the Risk Management Committee (under SEBI LODR Regulation 21) or the Audit Committee is typically the body that commissions this review, receives the findings presentation, and tracks remediation progress across cycles. Even where no statutory Committee exists, we recommend the Board or a designated senior management group play this role — reviewing findings directly, assigning remediation ownership, and requiring evidence of follow-up closure rather than accepting a self-certified 'resolved' status.
| Feature | Generic BCP Template Provider | Boutique IT/DR Consultancy | PNPC Global |
|---|---|---|---|
| Business Impact Analysis depth | Often skipped or generic — same RTO/RPO applied to every system | Usually thorough on the technical side, but rarely tied to business-owner input | Full BIA with process-specific RTO/RPO, defined jointly with business owners and IT |
| Backup restoration testing | Not typically offered — policy document only | Sometimes offered as a separate paid technical service | Included as standard verification within the engagement, not an optional add-on |
| Failover / DR drill testing | Not typically offered | Available, but often without business-impact framing | Coordinated failover testing where feasible, framed against the business's actual RTO/RPO tolerance |
| Statutory & regulatory grounding of findings | Not applicable — template-only providers | Often limited — technical expertise without deep CA/regulatory grounding | Senior CA-led — every finding connected to actual SEBI CSCRF, RBI, Companies Act, and Board-reporting context |
| Tabletop exercise included | Rarely, if ever | Sometimes, as a separate paid add-on | Included as a standard part of the engagement to test the plan, not just document it |
| Engagement continuity | One-time document delivery, no ongoing relationship | Variable — depends on consultancy size and retention | Same engagement partner from scoping through Board presentation and follow-up verification |
| India-UAE group coverage | Not available | Rarely available | Single coordinated engagement across Chennai, Bangalore, Hyderabad, and Dubai offices |
| Board presentation | Not offered — document delivered by email | Varies by consultancy | Engagement partner presents findings personally to the Audit Committee/Board/IT Strategy Committee |
| Follow-up verification | Not offered | Inconsistent, often re-priced separately | Built into the engagement scope as a standard follow-up review, including re-tested backups where applicable |
What the PNPC package includes
- 01
Scoping consultation to align the review with your actual risk driver — regulatory obligation, near-miss incident, infrastructure change, or pre-transaction readiness
- 02
Business Impact Analysis with Recovery Time Objective and Recovery Point Objective quantified for each genuinely critical process and system
- 03
Single-point-of-failure mapping across key personnel, sole-source vendors, facilities, cloud regions, and IT systems
- 04
Review and update of existing Business Continuity and Disaster Recovery Plan documentation against BIA findings
- 05
Technical verification of backup frequency, retention, and actual restoration test history — not just policy documentation
- 06
Assessment of replication and failover architecture, with a coordinated controlled failover test where feasible
- 07
Facilitated tabletop exercise simulating a realistic disruption scenario to test the plan in practice
- 08
Rated, prioritised findings register with root-cause analysis spanning organisational, process, and technical DR gaps
- 09
Management response capture before the report reaches the Audit Committee or Board
- 10
Live presentation to the Audit Committee / Risk Management Committee / IT Strategy Committee / Board by the engagement partner
- 11
Follow-up verification review within the agreed remediation period, including re-tested backups or failover where applicable
- 12
India-UAE coordinated coverage for group structures with a Dubai or overseas subsidiary
- 13
Direct access to your engagement partner — by phone and WhatsApp — for questions between formal review cycles
Find out whether your business would actually keep running through a real disruption — before that question gets answered the hard way, during an actual outage. Speak with a PNPC engagement partner, a practising Chartered Accountant who will map your real dependencies, test your real backups and failover, and present findings your Board can act on immediately.